If you’re new to energy storage, “500 kWh” looks abstract. This guide explains—in plain English—what 500 kWh actually means, how long it can run typical loads, what’s inside a containerized ESS, what it costs, and when a 500 kWh system is the right choice.
What does 500 kWh mean (kWh vs kW)?
- kWh (kilowatt-hour) is energy—how much electricity is stored or consumed over time.
- kW (kilowatt) is power—how fast you use or deliver energy at a moment in time.
A quick rule you can keep in your head:
Runtime (hours) ≈ Battery Energy (kWh) ÷ Load (kW)
So a 500 kWh battery can theoretically deliver:
- 50 kW for ~10 hours, or
- 100 kW for ~5 hours, or
- 250 kW for ~2 hours, etc.
Real-world runtime is slightly lower because of inverter efficiency, cabling, HVAC, and your chosen usable SOC window (for example, using 10%–90% to extend life).
How long can 500 kWh last at different loads?
Below is a simple planning table to set expectations before detailed engineering. It assumes 90% round-trip inverter efficiency and 80% usable capacity (i.e., ~400 kWh usable); adjust to your policy.
| Continuous Load (kW) | Quick Use Case (examples) | Approx. Runtime* |
|---|---|---|
| 50 | Critical circuits in a small commercial building | ~8.0 h |
| 75 | Refrigeration + lighting + IT for a supermarket | ~5.3 h |
| 100 | Small manufacturing line or campus core loads | ~4.0 h |
| 125 | Light industrial shift; event power | ~3.2 h |
| 150 | Construction site, pumps, HVAC | ~2.7 h |
| 200 | Peak shaving block; limited backup | ~2.0 h |
| 250 | Fast-charge buffer, large HVAC start-ups | ~1.6 h |
| 300 | Short bursts or high-demand processes | ~1.3 h |
*Assumes ~400 kWh practical usable energy. Your actual runtime depends on efficiency, temperature, and control strategy.
Back-of-napkin formula you can reuseRuntime (h) = (Battery_kWh × Usable_% × Efficiency_%) ÷ Load_kW
How many homes or EVs can 500 kWh support?
To make numbers tangible, let’s use conservative assumptions and show the range rather than a single fixed claim.
Households
- If one home uses ~30 kWh/day, then 500 kWh ≈ 16–17 home-days of electricity for basic needs.
- If your homes average ~20 kWh/day, the same battery covers ~25 home-days (e.g., 25 homes for one day, or 12 homes for two days).
These are rough guides—actual usage varies a lot by climate and appliances.
Electric vehicles (fast charging)
Assume you use the battery as a DC fast-charge buffer and you’re delivering ~90% of its energy to vehicles (conversion and heat losses happen), and each EV receives:
- ~60 kWh per car (typical “good top-up”):
~7–8 cars from one 500 kWh pack. - ~35–40 kWh per car (e.g., 20%→70–80% session):
~11–14 cars.
Real EV numbers depend on your charge window, station power, charging curve, and whether cars arrive pre-conditioned.
What is inside a 500 kWh containerized ESS?
A modern 500 kWh “battery in a box” is more than cells:
- Cells & Racks (LFP chemistry): Lithium iron phosphate is preferred for stationary storage thanks to thermal stability, long cycle life, and robust safety margins.
- BMS (Battery Management System): Cell-, module- and rack-level control for balancing, fault isolation, and event logging.
- PCS (Power Conversion System): Converts DC battery power to AC. Typical integrated PCS choices for 500 kWh are ~125–250 kW, depending on whether you need 4h, 2h, or 1.5h discharge duration.
- EMS (Energy Management System): Schedules charge/discharge (peak shaving, backup, solar self-consumption), controls grid interactions, and logs data.
- Thermal Management (HVAC / liquid cooling): Keeps cells in the sweet-spot temperature band to protect life and performance.
- Fire Protection & Compliance: Detectors, suppression interfaces, sectionalization, and vents aligned to local codes and test standards.
- Switchgear & Protection: Breakers, contactors, relays, and metering.
- Enclosure: Usually a 20-ft container footprint with access panels; outdoor-rated.
Typical DC bus and container numbers you’ll see on spec sheets include a mid-hundreds DC voltage, amp-hour rating that multiplies to ~500 kWh, weight around several to ~10+ tons, and a 10-year warranty option. Exact values vary by integrator and PCS choice.
How much does a 500 kWh battery system cost?
Market pricing moves with lithium, supply chain, and the feature set. For budgeting, many integrators quote a system-level range rather than a single number.
- Indicative range: USD 300–450/kWh (system-level), so USD 150k–225k as a very rough orientation for a basic 500 kWh AC-coupled ESS.
- Higher if you add liquid cooling, longer warranties, advanced fire systems, customized switchgear, or larger PCS.
- Lower in volume programs or simplified DC-coupled builds.
Major cost drivers
- Power rating (kW) & duration (h) you require.
- Thermal & fire design (code requirements differ by region).
- Certification package (UL9540/9540A, UL1973, IEC, grid codes).
- Site scope (civil works, cabling, protection, commissioning).
- Warranty terms and service level.
For a purchase decision, we’ll translate your load list, target runtime, and interconnection into a line-item proposal.
Grid-tied vs off-grid: which 500 kWh setup fits your site?
- Grid-tied (most common): Peak shaving, demand charge reduction, PV self-consumption, backup for critical circuits, power quality support.
- Off-grid / Microgrid: Combine PV + genset + ESS. The battery minimizes generator runtime and fuel while keeping lights on at night or in bad weather.
- EV fast-charge hubs: Use ESS as a buffer so you don’t oversize your grid connection; recharge from the grid at lower tariff windows or from on-site PV.
Specs & footprint: 277/480Y three-phase 500 kWh ESS
Note: The numbers below illustrate what you’ll typically see on commercial spec sheets. Exact values will be confirmed in your proposal.
- Energy capacity: ~500 kWh LFP (usable window configurable)
- Power options: 125 kW (4 h) / 200 kW (2.5 h) / 250 kW (2 h)
- AC output: 277/480 V, 3-phase, 60 Hz (other grids available on request)
- Enclosure: 20-foot container, approx. 20′ × 8′ × 8′
- Environmental: Outdoor-rated; integrated HVAC
- Compliance (typical): UL9540/9540A, UL1973, IEEE-1547/grid code where applicable
- Warranty: Up to 10 years options (cycles and throughput apply)
How do you pair solar or a generator with 500 kWh?
- With solar (PV):
- Rule-of-thumb charge time = Battery_kWh ÷ PV_kW under good sun.
- Example: 200 kW PV can charge ~500 kWh in ~2.5–3.5 h on a clear day (real time depends on irradiance, temperature, MPPT, and load in parallel).
- With a generator:
- Size the genset to support your peak loads + desired recharge rate (often 0.25C–0.5C charging in stationary ESS).
- The battery handles transients and short peaks; the generator runs fewer hours at efficient load.
Our engineering team will model real weather, your tariff, and load curves to optimize PV/ESS/genset sizing and operating strategy.
Safety, certifications & operations
- Chemistry & design: LFP cells with layered protection (fusing, contactors, software limits).
- Thermal & fire: Zoned detection, fast alarm propagation, HVAC/venting, suppression interfaces; tested at system level (e.g., UL9540A).
- O&M: Remote monitoring, periodic visual checks, filter changes, firmware updates.
- Site readiness: Pad, clearances, cable routes, earthing, access for service.
FAQ
Is 500 kWh the same as 500 kW?
No. kWh is energy; kW is power. You need both to plan runtime.
Can a 500 kWh battery run a building overnight?
Often yes for critical circuits. Use the runtime table with your actual kW demand.
How many EVs can 500 kWh fast-charge?
Roughly 7–8 full top-ups at ~60 kWh each, or ~11–14 partial top-ups (~35–40 kWh), assuming ~90% delivery efficiency.
How long to charge 500 kWh from PV?Time ≈ 500 ÷ PV_kW under good sun (then adjust for weather and in-parallel loads).
What certifications should I look for?
UL9540/9540A, UL1973 (or regional equivalents), plus grid interconnection compliance.
What’s a typical warranty?
Up to 10 years with cycle/throughput conditions.
Next steps
- Send your load list (kW by circuit) and target backup hours.
- Tell us whether the system will be grid-tied, off-grid, or a PV/EV hub.
- We’ll return a 500 kWh concept + price band, with the right PCS power and thermal/fire package for your jurisdiction.
Want a quick ballpark? If your critical load averages 120 kW, expect ~3.3 hours of backup from a 500 kWh pack at common efficiency/usable settings—then we tune it from there.
Bottom line: A 500 kWh containerized LFP system is a versatile building block—big enough to matter for peak shaving, backup, and EV fast-charge buffering, yet modular to scale toward 1 MWh and beyond. If you share a few site details, we’ll turn this into a precise, code-ready proposal.